Arestis Download
Available on the App Store · Android beta →
Training · Measurements · Progress

Your workout log,
with your progress made clear.

Arestis is a workout log app for strength training: log your sessions, sets and weights, track your measurements, and watch your progress day after day.

Free No ads iPhone & Android Works offline
Arestis home screen: start a workout and the month calendar
300+exercises, plus your own
13muscle groups
8rest timer sounds
0ads, 0 subscriptions
During the workout

You train.
Arestis keeps count.

Tick a set and the rest timer starts by itself. The clock, the volume and the sets stay up to date while you recover.

  • Automatic rest, adjustable per exercise
  • Supersets, warm-up sets, bodyweight, weighted
  • Undo and redo: a mistake is fixed in one tap
  • Leaving halfway? The workout is kept as a draft
A workout in progress in Arestis: clock, rest timer, sets to tick
After the workout

Your progress,
made clear.

Charts you can read at a glance, over a week, a month, a year or your whole history.

  • Estimated 1RM, max load and volume per workout
  • Your records, exercise by exercise
  • A comparison with the previous period
  • The split by muscle group: you see what you skip
Statistics in Arestis: estimated 1RM, max load, volume and muscle group split
Progress chart of an exercise in Arestis
Week after week

Your history.
Your programs.

Every workout is filed by week and reopens in one tap. Your routines become programs, and your schedule puts them on the right day.

  • Reusable programs, built your way
  • A weekly schedule: today's workout is waiting
  • Redo a past workout without retyping anything
  • A calendar of all your workouts
Workout history in Arestis, grouped by week
The details that matter

Built for the gym,
not for the showroom.

Everything below is in the app today. None of it is a promise.

A rest timer that actually rings.

Screen locked, phone on silent, earbuds in: the end of your rest still reaches you. Eight sounds to choose from.

More than sets and reps.

Strength, duration, distance, or both. With a load, at bodyweight, or weighted.

Share a workout with a link.

The link contains the workout: nothing is stored on a server. Or turn it into an image to post.

Your history comes with you.

Strong, Hevy, FitNotes, a spreadsheet, or even a paper notebook. Arestis gives you the instructions, the AI of your choice tidies up your notes, and you import the result. Wherever you come from.

Your body, tracked to the centimetre.

Weight, body fat and thirteen measurements, left and right kept apart. Each one has its own chart.

Your data stays yours.

Full JSON and CSV export whenever you want. And an account that really gets deleted.

Connected to Apple Health and Health Connect.

Your finished workouts are saved there. Your weight, body fat and waist size travel both ways. Heart rate and energy burned are taken from Health, never estimated.

Make it yours

Your colour.

Light theme, dark theme, or whatever your phone uses. And you pick the accent colour: lime is only the starting one. Try it.

Preview

Simple, on every screen.

A clear interface, made to be quick between two sets.

A program and its workouts in Arestis
Programs
Weight and body measurement tracking in Arestis
Measurements
A workout turned into an image to share
Share as an image
The workout calendar in Arestis
Calendar
An exercise sheet: description and muscles worked
Exercise sheet
Get started

Ready in one minute.

Install the app

Free on the App Store, in beta on Android.

Build your workout

Pick from the exercise library, or create your own.

Tick, rest, repeat

Arestis handles the clock, the rest timer and the stats.

Where the name comes from
ἀρετή
aretē · feminine noun · ancient Greek

“Excellence: the full realization of the potential of a person or a thing.”

Arestis carries this idea: giving you the tools to measure your effort, track your progress and become your best self. Not just at the gym, but over time.

Questions

What people ask us.

Is Arestis really free?

Yes. No ads, no subscription, no in-app purchase.

Does the app work offline?

Yes. Everything is saved on your phone first, and syncing happens when the connection comes back. Basement gyms are not a problem.

I'm coming from another app. Do I lose my history?

No. Arestis imports exports from Strong, Hevy and FitNotes, or any spreadsheet. For a paper notebook or loose notes, the app prepares the instructions to give to the AI of your choice, which hands you back a file ready to import. The full guide.

Is there an AI inside the app?

No. Arestis prepares a file of your training, and you send it to whichever AI you like. The app transmits nothing by itself.

What happens to my data?

It is tied to your account so that it can sync. You can export everything at any time, and delete your account from the settings: it is erased after 30 days. The details are in the privacy policy.

Does Arestis connect to Apple Health?

Yes, and to Health Connect on Android. You choose what to allow in Settings, then Health: saving your workouts, exchanging weight and measurements, reading your heart rate.

What about Android?

The app is in closed testing on Google Play. You can join the beta in three steps, explained below.

Is the app available in French?

Yes. Arestis is in English and French, and also works in pounds, miles and feet.

● Available on the App Store

Get Arestis.

Free on iPhone. On Android, the app is still in closed testing: join the beta in three steps.

iPhone

Arestis is on the App Store, free and ad-free.

Download on the App Store
QR code to Arestis on the App Store On a computer? Scan this code with your iPhone camera.
Were you testing through TestFlight? Install the App Store version: it replaces the test build, and your workouts stay in your account.

Android · beta

  1. Join the Google groupgroups.google.com/g/arestis
    Required by Google for closed testing.
  2. Wait 15 minutesThe time it takes Google to recognize you as a tester.
  3. Install the appplay.google.com/store/apps
Seeing an error or “app not available”? The 15 minutes haven't passed yet. Wait and try again, it's not on your end.

Why a beta? Google requires 12 testers for 14 days before an app can open to everyone. By joining, you help Arestis launch on Google Play.

Trouble installing? Write to us at contact@arestis.com.

Ready to get started?

Download on the App Store
Cette page existe aussi en français.Voir en français